Switching language…
We are BIM Solutions BIM Managers Technical Documentation Leads Quantity Surveyors BIM Coordinators Construction Managers Architects 3D Visualisers Consultants Engineers MEP Specialists Electrical Designers Developers Data Analysts

We build a database in the shape of your project.

BIM·ARG is a BIM production studio used by architects, construction firms and developers to create digital twins, eliminate rework, lock in budgets and build with millimetre precision.

We reply within 48 working hours.

13 years
Documenting construction
11
Active clients
5
Systems on a single BIMGRID™ grid
The real problem in AEC

We're not doing the job badly. What we were taught to do is wrong.

According to McKinsey Global Institute, 80% of construction projects finish over time and over budget. Not because people are disobedient. The opposite: they do exactly what they were told to do. The problem is that what they were told is wrong.

80%

Missing system, not effort

The construction industry works with the same intensity as any industry that does hit its numbers. What's missing isn't hours. It's method.

1+1≠3

Optimising parts, not the whole

The architect improves the design. The structural engineer their structure. The builder their site. Each one does their part well, isolated. The final project still comes out late and over budget.

+30 years

The historical gap

Toyota developed its production system between 1948 and 1975. The global automotive industry adopted it as Lean Manufacturing in the 90s. Software, manufacturing and logistics followed. Construction did not. We're 30 years behind the industries that already validated the method. BIMARG exists to close that gap.

That's why we built BIMGRID. The grid where RIBA, Lean, Last Planner, BIMBOX, ISO 19650 and ISO 7817 run together as a single production method.

Three ways to work with us

Pick where you need it.

Each segment has its own workflow, pricing and dedicated landing with full technical detail. Click into the one that fits you.

Our method

BIMGRID™

Three frameworks and two standards, proven in the industry, running together on a single coordination grid.

We didn't reinvent the wheel. We took the best systems the industry already validated and we run them in parallel. Each one contributes a piece the others don't have. That's how we get where others don't.

Frameworks How we structure the project
01

RIBA Plan of Work

Structure

8 stages with stage-gates. The client signs off each stage before moving on. Late changes become billable, because they're documented.

02

Lean Construction

Efficiency

Zero waste of information. A single federated model where architecture, structure and MEP coexist. If something doesn't add value to the project, it doesn't go in.

03

Last Planner System

Reliability

Weekly collaborative planning. Teams commit to concrete deliverables, not aspirational dates. The schedule is met because it's built from the bottom up.

Standards The rules every BIM project must follow
04

BIMBOX

Coordination

A levels and disciplines system that organises every model under a shared matrix. It lets any specialty fit with the others without reinventing the nomenclature each time.

05

ISO 19650 + 7817

International standards

The two global standards that govern BIM management. ISO 19650 organises project information. ISO 7817 defines modelling rules. Together they make our work readable to any BIM team in the world.

BIMBOX in production

It lets us split the production matrix into parts and assemblies, the same way every other industry works. That's why we deliver complete documentation in weeks, not months, and we improve with every project that runs through the system.

See BIMBOX in action →
BIMBOX running on laptop and mobile: the matrix of levels and systems that organises the 22 disciplines coordinated in every BIMARG project.
Why BIM

Construction is the only industry in the world where the first prototype is the real building.

Toyota crashes the car a thousand times against a virtual wall before touching the metal. Boeing flies the first plane inside a computer. Construction still finds the problems with the walls already up and the money already spent. That's why it's the only industry that in 80 years barely improved its productivity: agriculture and manufacturing multiplied by 10 to 15 times. Construction stayed frozen.

98%
of megaprojects end with
cost overruns above 30%
77%
are delayed at least
40%
10-15×
agriculture and manufacturing
productivity grew since the 1950s
0×
construction productivity grew
in the same period
A BIM model is not documentation. It is information engineering. It is not a tidier drawing or a file that gets sketched. It is the complete reconstruction of the building in a digital environment, with every pipe, beam and duct modelled and cross-checked. Clashes are detected before they exist in reality, where fixing them is free.
BIM does not belong in the project fees line. It belongs in cost-overrun control. That is the mistake we see most often: putting BIM inside the designer's fee budget. It is misplaced. BIM belongs alongside performance bonds and contingency. That is where its real return shows: it is the insurance of the project's profitability.
Ten years building the template. A shipyard does not improvise how to model a vessel. An aircraft plant has its system. Construction is the only industry that still starts from scratch on every job. BIMGRID™ is our own system: the structure that lets us build the complete digital twin in months, not years. That is what you contract. Not drafting hours: a proven method and a team that knows how to use it.

Sources: McKinsey, The construction productivity imperative (2015) and McKinsey Global Institute, Reinventing construction: A route to higher productivity (2017).

Recent work

Delivered projects.

Construction documentation, planning submission, quantity take-offs, clash detection, MEP coordination and renders. Every project coordinated under BIMGRID™.

We modelled the YPF offices at Torre Confluencia (Neuquén) with CODESIN, and we're starting our next project with Parrado Arquitectura in Pilar, Buenos Aires.

What clients say on Google

11 reviews. All 5 stars.

Reviews published on our Google Business Profile, written by real clients we've worked with.

★★★★★
BIMARG is essential for any professional looking to make the leap to the BIM standard. Highly recommended for their commitment and seriousness.
Nicolás Villaverde Verified on Google · Translated from Spanish
★★★★★
Excellent working system. On site, it helps save time and cost.
Matías Pozo Verified on Google · Translated from Spanish
★★★★★
Excellent BIM model production. Teamwork and communication, top notch.
Fhaner Romero Local Guide · Verified on Google · Translated from Spanish
5.0
Average rating
11
Verified reviews
2
Local guides
71
Photos contributed
Strategic Partner Programme

We're looking for one new partner in 2026.

As strategic partners we choose who we work with. We take on one studio or construction firm per year to build a long-term relationship. PROAARQ is our current partner: in 18 months they went from "let's see" to their own production system that sustains their growth. For 2026 we're opening a second slot.

  • Pricing locked in USD for 12 months. No inflation or FX adjustments.
  • Priority in the production queue. Delivered ahead of one-off projects.
  • Dedicated BIM Manager. One person knows all your projects.
Apply as a partner →

30-minute diagnostic interview before we close the slot.

What we believe

6 things we don't compromise on.

01

Precision isn't an extra. It's the floor.

A drawing with an error is a broken drawing. We deliver to the millimetre or we don't deliver.

02

The model comes before the drawing.

We model in 3D first, then derive the drawing. Never the other way round.

03

No change without sign-off.

What isn't signed isn't approved. And what's approved costs to modify.

04

The schedule is built by the team, not the manager.

Last Planner System. The people who execute commit to what they can deliver.

05

A single source of truth. Always the model.

When the drawing and the model don't match, the model wins. The whole project derives from there. Everything else is downstream.

06

BIM is spoken in every language.

ISO 19650 and ISO 7817 are the same in Buenos Aires, Madrid or London. We work with any studio in the world without translating the method.

About BIMARG

13 years documenting construction. From Buenos Aires to London. One conviction.

I'm Franco Srebernic, BIM Manager and founder of BIMARG. I've been documenting construction in Argentina for 13 years. I spent 2 years in Australia working as a lead hand on real sites, learning how the industry thinks when the system works. And 6 months in England, in the home of RIBA Plan of Work, seeing how it runs when the standard is the rule, not the exception. That same method runs inside BIMGRID™ on every project we deliver.

Today we operate from Argentina for architecture studios, construction firms and developers across the country. In the second half of 2026 we're opening operations in Spain and England, the markets that taught me how the industry should run.

I'm convinced the work we do unlocks things bigger than a well-built model: when a project is properly documented, ROI goes up, wages go up, costs come down, and housing becomes more affordable. That's why we do this.

Franco Srebernic Founder and BIM Manager

Mission

Industrialise BIM production in construction. Drive down construction costs, raise wages and make housing more accessible. We start in Argentina; we scale to Spain and England.

Vision

To be the BIM production standard for architecture, construction and real estate development in the three markets where we operate. So that any serious project runs through our grid before going to site.

From the blog

What we write about BIM, construction and process.

Your next project

The next project you start without BIM will cost 10% to 20% more (Dodge Data, McKinsey). The one you start with us, won't.

Reply within 48 working hours. Free diagnostic interview.

Get a quote →